1.696 m³ capacity 1 pc. Grading Area (+10°C/+12°C) 1.696 m³ capacity 1 pc. Grading Area (+10°C/+12°C) 1.696 m³ capacity 1 pc. Grading Area (+10°C/+12°C) 1 x Grading Area, 1 x Gutting Area, 1 x Loading/Unloading Area, 1 x Chiller Room, 1 x Blast Freezer Room, and Others Fish Processing Facility 1640 m² Split Refrigeration System, Central Refrigeration System 10 x Sliding Door, 2 x Sectional Door 3504,61 m² 424,17 m² 4,00 m +10°C/+12°C 1.696 m³ 336 m² 4,00 m +10°C/+12°C 1.344 m³ 64 m² 4,00 m +10°C/+12°C 256 m³ 72 m² 4,00 m +2°C 288 m³ 72 m² 4,00 m -18°C 288 m³ 64 m² 4,00 m -40°C 256 m³ 60 m² 4,00 m – 240 m³ 140 m² 4,00 m – 560 m³ 22,50 m² 4,00 m – 90 m³ 20 m² 4,00 m – 80 m³ 20 m² 4,00 m – 80 m³ 20 m² 4,00 m – 80 m³ 12,5 m² 4,00 m – 50 m³ 15,50 m² 4,00 m – 62 m³ 42 m² 4,00 m – 168 m³ 91 m² 4,00 m – 364 m³
1.344 m³ capacity 1 pc. Gutting Area (+10°C/+12°C)
256 m³ capacity 1 pc. Loading/Unloading Area (+10°C/+12°C)
288 m³ capacity 1 pc. Chiller Room (+2°C)
288 m³ capacity 1 pc. Freezer Room (-18°C)
256 m³ capacity 1 pc. Blast Freezer Room (-40°C)
240 m³ capacity 1 pc. Boxes Store
560 m³ capacity 1 pc. Anteroom
90 m³ capacity 2 pcs. Store
80 m³ capacity 2 pcs. Office
80 m³ capacity 1 pc. Chemical Room
80 m³ capacity 1 pc. Lundery
50 m³ capacity 1 pc. Lockers
62 m³ capacity 1 pc. Bathroom
168 m³ capacity 1 pc. Sanitation Area
364 m³ capacity 1 pc. Management Area
1.344 m³ capacity 1 pc. Gutting Area (+10°C/+12°C)
256 m³ capacity 1 pc. Loading/Unloading Area (+10°C/+12°C)
288 m³ capacity 1 pc. Chiller Room (+2°C)
288 m³ capacity 1 pc. Freezer Room (-18°C)
256 m³ capacity 1 pc. Blast Freezer Room (-40°C)
240 m³ capacity 1 pc. Boxes Store
560 m³ capacity 1 pc. Anteroom
90 m³ capacity 2 pcs. Store
80 m³ capacity 2 pcs. Office
80 m³ capacity 1 pc. Chemical Room
80 m³ capacity 1 pc. Lundery
50 m³ capacity 1 pc. Lockers
62 m³ capacity 1 pc. Bathroom
168 m³ capacity 1 pc. Sanitation Area
364 m³ capacity 1 pc. Management Area
1.344 m³ capacity 1 pc. Gutting Area (+10°C/+12°C)
256 m³ capacity 1 pc. Loading/Unloading Area (+10°C/+12°C)
288 m³ capacity 1 pc. Chiller Room (+2°C)
288 m³ capacity 1 pc. Freezer Room (-18°C)
256 m³ capacity 1 pc. Blast Freezer Room (-40°C)
240 m³ capacity 1 pc. Boxes Store
560 m³ capacity 1 pc. Anteroom
90 m³ capacity 2 pcs. Store
80 m³ capacity 2 pcs. Office
80 m³ capacity 1 pc. Chemical Room
80 m³ capacity 1 pc. Lundery
50 m³ capacity 1 pc. Lockers
62 m³ capacity 1 pc. Bathroom
168 m³ capacity 1 pc. Sanitation Area
364 m³ capacity 1 pc. Management Area ROOM TYPES
PROJECT PURPOSE
PROJECT AREA
REFRIGERATION SYSTEMS
COLD ROOM DOORS :
COLD ROOM PANELS :
AREA
HEIGHT
ROOM TEMPERATURE
CAPACITY
AREA
HEIGHT
ROOM TEMPERATURE
CAPACITY
AREA
HEIGHT
ROOM TEMPERATURE
CAPACITY
AREA
HEIGHT
ROOM TEMPERATURE
CAPACITY
AREA
HEIGHT
ROOM TEMPERATURE
CAPACITY
AREA
HEIGHT
ROOM TEMPERATURE
CAPACITY
AREA
HEIGHT
ROOM TEMPERATURE
CAPACITY
AREA
HEIGHT
ROOM TEMPERATURE
CAPACITY
AREA
HEIGHT
ROOM TEMPERATURE
CAPACITY
AREA
HEIGHT
ROOM TEMPERATURE
CAPACITY
AREA
HEIGHT
ROOM TEMPERATURE
CAPACITY
AREA
HEIGHT
ROOM TEMPERATURE
CAPACITY
AREA
HEIGHT
ROOM TEMPERATURE
CAPACITY
AREA
HEIGHT
ROOM TEMPERATURE
CAPACITY
AREA
HEIGHT
ROOM TEMPERATURE
CAPACITY
AREA
HEIGHT
ROOM TEMPERATURE
CAPACITY